Published 2026-09-23
Removing a backyard pool in Miami-Dade means heavy gunite debris, a demolition permit, and tight backyard access. How to size and place the dumpster.
Yes. Pool demolition needs its own permit separate from any dumpster placement permit, and the county requires an inspection before a partially filled shell can be covered. Your demolition contractor typically pulls this permit; we only handle the debris.
Full removal takes out the entire gunite shell and backfills the hole. Cap-and-fill breaks holes in the floor for drainage, cuts the rebar, and fills the shell in place. It's faster and cheaper but still needs an engineer's letter or permitted sign-off and a county inspection.
A full removal on an average in-ground pool usually takes two to four 30-yard loads once you account for the weight, not the volume. A cap-and-fill job often needs only one. Give us the pool size and the method and we'll schedule the swap-outs.
If the gate and side yard path are wide enough and clear of low branches or wires, yes. If not, we place the container in the driveway or on the street side and your demolition contractor moves the debris out to it with an excavator or bobcat.
Call or text a photo of your junk to (305) 986-0692. We estimate it straight, you decide.
