Published November 20, 2026 · Updated November 20, 2026
A single facade or wing of spalling repair flagged by the engineer's report usually fits a 20-yard dumpster; concrete restoration across an entire condo tower, or a parking garage slab repair, usually needs a 30-yard with scheduled swap-outs, as of 2026. Single-family homes and duplexes are exempt from this program; it applies to condos, co-ops, and larger commercial or multifamily buildings. Tell us how many phases the report calls for and we size the container before the crew shows up.
It comes down to how many sections of the engineer's report call for concrete work, not the building's total square footage. A single facade or wing with a handful of flagged spots is a different job from restoring balconies and columns across every elevation.
| Repair scope | Size | Why |
|---|---|---|
| Spot spalling repair on one facade or wing | 20 yard | A handful of flagged areas, not the whole envelope |
| Balcony and column concrete restoration, building-wide | 30 yard or scheduled swap-outs | Concrete is dense; weight hits the truck's limit before the box looks full |
| Parking garage slab repair | 30 yard, sized by weight | Garage slab work runs in phases, often over several weeks |
| Stucco patch and sealant work only (no structural repair) | 20 yard | A minor report finding, lighter debris |
| Balcony railing replacement alongside the concrete | 20 or 30 yard, by scope | Aluminum and steel railings add to the chipped-out concrete |
Miami-Dade has required buildings 40 years old and older to be recertified by a licensed architect or engineer for decades, with recertification repeating every 10 years after that. Single-family homes and duplexes are exempt; the program targets condos, co-ops, and larger commercial and multifamily buildings. After the June 2021 collapse of Champlain Towers South in Surfside, Florida passed a statewide law in 2022, commonly called SB 4-D, requiring Milestone Structural Inspections for condo and co-op buildings three stories or taller: the first inspection at 30 years, or 25 years if the building sits within three miles of the coastline, and every 10 years after. The law also requires a Structural Integrity Reserve Study (SIRS) so the association has funds set aside before repairs are needed.
Most recertification repairs come from the same root cause: rebar inside the concrete corrodes, expands, and cracks the concrete cover around it, a process that moves faster in buildings exposed to salt air near the coast. The fix is concrete restoration: the engineer marks the affected areas, the crew chips out the damaged concrete (what gets called spalling), cleans or replaces the corroded rebar, and patches and seals the surface. Balconies, columns, and parking garage slabs are the most common locations. Chipped-out concrete is dense the same way driveway or seawall demolition debris is dense, it fills a dumpster by weight long before it looks full, so tell us the square footage of affected concrete when you book and we size the container by weight instead of guessing by volume.
Recertification repairs almost always need board or association approval before work starts, and funding usually comes from the SIRS reserve or a special assessment, which affects how fast the project can move once the engineer's report is filed. The county sets a deadline for repairs to begin after the report is submitted, so the dumpster needs to be in place as soon as the contractor is ready, not weeks later. Most towers route debris through a parking garage ramp rather than a driveway, and some buildings still require the certificate of insurance and dock or elevator scheduling that any condo renovation needs; see our condo and high-rise dumpster guide for how that access typically works. If the findings are mostly exterior stucco rather than structural concrete, our stucco removal guide covers that debris separately.
Tell us how many phases the engineer's report breaks the work into, whether it's one facade or the whole building, and whether parking garage slab work is part of it, and we size 20 vs 30 yard and whether the job needs scheduled swap-outs. Garage and loading dock access varies by building, so we confirm clearance and ramp height before delivery. We're a family company based in Kendall, licensed and insured since 1993, serving Miami-Dade and Broward condo associations and property managers.
A requirement that buildings 40 years old and older be inspected and recertified by a licensed architect or engineer, repeating every 10 years after. It targets condos, co-ops, and larger commercial or multifamily buildings, not single-family homes or duplexes.
No. Single-family homes and duplexes are exempt from both Miami-Dade's 40-year recertification and the state's Milestone Inspection law. Those programs apply to condos, co-ops, and larger commercial or multifamily buildings.
Milestone Inspections are a statewide requirement passed in 2022 after the Surfside collapse, specific to condo and co-op buildings three stories or taller: the first inspection at 30 years, or 25 years within three miles of the coast. Miami-Dade's 40-year recertification is a separate, older county program that applies more broadly to older buildings.
A 20 yard covers spot repairs on one facade or wing. Building-wide balcony and column restoration, or parking garage slab work, usually needs a 30 yard or scheduled swap-outs, since chipped-out concrete is dense and hits the weight limit fast.
Either works. Many associations have their restoration contractor book and coordinate the container as part of the repair contract; some property managers book it directly. Tell us which when you call so we send invoices and updates to the right person.
Usually yes, with the ramp height and clearance confirmed ahead of delivery. Most towers route construction debris through the garage rather than a driveway, and we work around the building's access rules the same way we do for any condo renovation.
A single-facade spot repair can wrap in a standard 7-day rental. Building-wide concrete restoration or garage slab work usually spans several weeks to months, so we schedule swap-outs timed to each phase instead of one container sitting idle between them.
Call or text a photo of your junk to (305) 986-0692. We estimate it straight, you decide.