Most accessory dwelling units (ADUs) in Miami-Dade, whether a garage conversion or a new detached unit in the backyard, start with a 20-yard dumpster for demolition and site prep, then move to a 30-yard or a scheduled swap-out during framing and finishes, as of 2026. The county only allows these units in unincorporated areas inside the Urban Development Boundary, on a lot of at least 7,500 square feet (5,000 for a garage conversion). We rent 20 and 30-yard dumpsters across Miami-Dade and Broward.
The construction stage decides the size, not the ADU's finished square footage: a garage conversion generates far less debris than a new unit with its own foundation and slab.
| Stage | Size | Why |
|---|---|---|
| Garage conversion (interior demo) | 20 yard | Drywall, doors, and the old garage floor fit easily, and the container still fits in the remaining driveway |
| Site prep for a new detached unit | 20 yard | Old fencing, a small slab, or backyard vegetation; bulky but light |
| Framing, roof, and drywall | 30 yard, or a 20 with a scheduled swap-out | The lumber and drywall volume from a full new build fills a 20 yard fast |
| Stucco, block, and slab (CBS, the standard Miami build) | Sized by weight, with scheduled swap-outs | Concrete and block hit the truck's legal weight limit before the container is full |
| Final finishes and cleanup | 20 yard | Paint scraps, packaging, and flooring or cabinet trim |
Most Miami ADUs are built CBS, concrete block and stucco, which is standard for the area's wind code but heavy to haul. Block, stucco scrapings, and slab concrete hit a truck's legal road weight long before a 20 or 30-yard container looks full, so we size that debris by weight and schedule a swap-out instead of overloading one box. Tell us when you book if the stage involves block or a tear-out slab; see our guide to dumpster weight limits in Miami for what concrete and block actually weigh.
ADU permitting in unincorporated Miami-Dade runs on its own timeline, often several weeks between site plan approval and a framing inspection, so the debris volume rarely stays constant. A standard 7-day rental works for a garage conversion that moves fast, but a new detached unit usually needs scheduled swap-outs timed to the framing and finish stages instead of one container sitting idle between inspections; see our guide to scheduled swap-outs for how we coordinate that with a crew's pace.
An ADU is a second livable unit on the same lot as your house, either a garage conversion or a new detached structure. Miami-Dade allows them only in unincorporated areas inside the Urban Development Boundary, on a lot of at least 7,500 square feet (5,000 for a garage conversion), and the owner must live in the main house or the ADU as a primary residence.
No. The county ordinance covers unincorporated Miami-Dade only. Incorporated cities, including Hialeah, Doral, Coral Gables, and the City of Miami, set their own ADU rules, so check with the municipality before planning the build.
A 20-yard dumpster handles most garage conversions: the interior demo, old drywall, flooring, and doors fit without filling it, and it still leaves room in the driveway for the rest of the build.
No county permit is needed if the container sits entirely on your own driveway. A right-of-way permit is only required if it has to go on the street or the swale, which is more likely on a smaller ADU-sized lot.
No. The county ordinance requires the owner to live in either the main house or the ADU as a primary residence and sets a one-month minimum rental, which rules out short-term and vacation rentals.
A standard 7-day rental covers a garage conversion. A new detached unit usually spans several weeks across site prep, framing, and finishes, so we schedule swap-outs timed to each stage instead of one container sitting for the whole build.